
Detail of center panels during installation
The main window at Christ Church in Greenwich was being removed for cleaning and repair. This process was to take approximately six months and so a temporary replacement was necessary. Each panel of the original window was photographed and then digitally printed onto a special semi-translucent, backlit, adhesive paper. Each section was then installed by adhering the print to the safety glass.
